Abstract

Despite significant progress in increasing electricity access to over 78%, electricity reliability in Tanzania remains a concern, with frequent power outages reported. Maintenance issues in hydropower plants have been identified as a critical factor contributing to this problem. However, the specific maintenance performance levels have not been fully assessed. This study conducts a comprehensive evaluation of the maintenance performance of four key hydropower plants: Kidatu (204 MW), Kihansi (180 MW), Mtera (80 MW), and New Pangani Falls (68 MW). Data collected from staff surveys and maintenance records between 2018 and 2022 were used in the study. Although staff demonstrated a reasonable awareness of the hydropower plants Key Performance Indicators (KPIs), with a minimum mean score of 3.66, the findings reveal underperformance across all plants, with a heavy reliance on reactive rather than proactive maintenance. Low plant availability (89%), insufficient planned work (42%), and excessive unplanned work (55%) were recorded. High Mean time to Repair and frequent failures, particularly at New Pangani Falls, were also observed. This research underscores the importance of strategic maintenance improvements to enhance the reliability and efficiency of Tanzania's hydropower sector.

Publisher Name

University of Dar es Salaam

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.