•  
  •  
 

ORCID

https://orcid.org/0000-0002-2958-2919

Abstract

The power utility, Tanzania Electric Supply Company Limited (TANESCO) is faced with challenges of supplying adequate power to the ever-increasing demand. To this end, this paper explores the installed Ubungo Gas Power Plant (UGP II) located in Dar es Salaam to find means of utilizing it in co-generation method. The study embarked on detailed modelling of the system and run simulations which indicated that the co-generation can result to power generation efficiency increase between 10.42 to 50.92%. It is recommended to change the UGP II to exploit this co-generation method. Further, the study could be improved by including more parameters of the gas and steam plant and verify them experimentally.

Publisher Name

University of Dar es Salaam

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.